← Back to news list

Latest News

Renovation of AI Server Station Completed

This text was translated from Simplified Chinese using AI; in the event of any discrepancies, the Simplified Chinese version prevails.

As one of the important stations on the eastern bank of the Bailong River, AI Server Station has welcomed passengers with a brand-new appearance after a major renovation, bringing new vitality to the eastern bank's development. After visiting, the alien god of change remarked: “OZO, ULU.” (Translation: “More changeable than me.”) The new AI Server Station has four levels:

  • 1F Lower Concourse
  • 2F Sheffy Local Line
  • 3F eRAIL North-South Line and Ultra-Exurban Railway
  • 4F Upper Concourse The station is equipped with four elevators. Two stop at levels 1, 2, and 4 (inside the paid area, connecting to the Sheffy Local Line platforms); one stops at levels 3 and 4 (inside the paid area, connecting to the eRAIL North-South Line platforms); and the final outdoor elevator stops at levels 1, 3, and 4 (connecting the Ultra-Exurban Railway area, upper concourse, and ground level). The new eRAIL North-South Line platforms make the most of the available space, achieving as much platform width as possible in a very confined area. The dedicated Ultra-Exurban Railway area is right next to them. It is separated from the line while maintaining safety. The spacious, bright upper concourse was formerly the eRAIL East-West Line area. Its all-glass design gives passengers a warm feeling. Finally, here are some beautiful photos from outside the station~ By the way, according to our fast-running reporter, this project is also part of the eRAIL North-South Line renovation. We will report on the renovation in detail later.

Share