← Back to news list

Latest news

KR Railway Monthly Report (January 2025)

This text was translated from Simplified Chinese using AI; in the event of any discrepancies, the Simplified Chinese version prevails.

The first railway monthly report in 2025 is here~ Let’s take a look at what projects we carried out last month~

Comet Express Line A Logo Announced

This month, the logo exclusive to Comet Express Line A is announced! It combines various elements~ Comet Express Line A Exclusive Logo

A new era of transportation in Corricaus

On January 15, 2025, with the completion of the renovation of Sunset Heights Station and the modernization project of the Southeast Main Line, this line, one of the Four Heavenly Kings, will also write a new chapter. After the transformation, the Southeast Main Line will provide free services to passengers at 2-minute intervals from 8:00 to 1:00 the next day. Now, modernization projects on the Sunrise Plains Loop are also underway. After completion, all lines under Kolikaus Transport have been modernized, and Kolikaus Transport will also enter a new era.

Hoshino Railway Debut

This month we welcome a brand new railway company - Hoshino Railway. It took over the Snowfall-South Coast Central Section and Highlander-South Island Central Section of the original Highlander Main Line and carried out modernization to become part of the Hoshino Main Line and Shiroko Line respectively. On January 16, the first phase of the Shiroko Line and the first phase of the Hoshino Main Line were opened. The two lines are interconnected, connecting Bonan in the south and emerging cities in the northwest, and also provide strong impetus for the development of the South Bank sub-center. At the same time, this line is also the first express line in the server. Only stops at Abydos, Neptune, Texel, Rokko East (New Gate), Snowfall, South Bank Centre, Memorial, Bonan. Hoshino Railway Logo## Modern Xingang Metro The wind of modernization has also reached Xingang Metro. On January 28, the entire Xingang Line (KR Headquarters - Baipu North) completed the modernization, and 4 mini M-Trains provide services to passengers at 2-minute intervals. The next day, the New Taipei Line also started test operation. These two things mean that Newport Map has entered the modern era in great strides. In addition, on February 15, the pilot section of the east extension of the Xingang Line (KR Headquarters-Binjiang North) was opened, and the test operation range was changed to the "double-north" operation range from Baipu North to Binjiang North.

Xiaohou Trading was established

This month, omagari_hare established Xiaogou Trading, dedicated to the development of server bus services. At present, the rapid transit line B1 of Xiaogou Bus has begun test operation, and the construction of the station is also in full swing. It makes full use of part of the original Highlander Line and part of the roadbed of the fourth phase of the eRAIL North-South Line to provide convenient services for surrounding residents. Lines B2 and B3, which will utilize the existing sections of eRAIL's north-south line, are also being planned. Xiaohou Trading Logo## Major adjustments to the second phase planning 在最后,让我们介绍一下由Maki_Konuri进行大幅调整后的二期轨道交通规划:

  • 新港地铁 新港线东延伸:KR总部-赤羽叶子(利用原Express LineE东段)
  • 新港地铁 新港线西延伸:白浦北-埃加克-? ? ?
  • 新港地铁 新北线二期:心夏-一线海
  • Hoshino Electric Railway Gardenia Line: Yume-? ? ?
  • 真纪电铁 冬青线支线:青崖-叹息门
  • 真纪电铁 环奈线:绿桥-魔女之泉-逍遥港-绿桥(环线)
  • Comet Express Line B: Yu Diao-Bu Yao Cao Wo
  • Comet Express C Line西延伸:南岸中心-马西
  • Comet Express Line C Millennium Connection Line: Hokkaido-Aohara Gorge (taking over Millennium Line 1)
  • 星光电铁 星光线二期:逍遥港南-南海港-水林(接管南横线)
  • BRT Binjiang Channel: Hokkaido Industrial Park-Binjiang (eRAIL north-south line reconstruction)
  • BRT Highlander Passage: Tea Garden-Memorial (Renovation of Highlander Main Line)
  • New route: Chitose - Simonsho - Suiyun Industrial Park - Shuilin (may be subject to major changes) 近期轨道交通规划图

Share